Love Field Modernization Program (LFMP)

image3 2 1

Project Details

Project Name: Love Field Modernization Program (LFMP) Project
Project Location: Dallas, Texas
Project Description: As part of the overall capital improvement project, the LFMP required the demolition of the existing terminals along with their combined 20 gates. Terminal includes a new 20-gate T-shaped central concourse, check-in space, baggage claim areas and main lobby.

Project Size (Gross Square Feet) and Type:

  • Terminal 913,956 sq. ft. (LFMP LEED® Boundary)
  • Central Plant
  • Control Tower

Owner: The City of Dallas
Developer: Southwest Airlines
Architect: Corgan Associates
MEP Engineer: Jacobs, Dallas
General Contractor: Hensel Phelps Construction Co.
Project Duration: Begun 2011 and completed October 2014.
Additional building now underway.
USGBC LEED® Certification Date and Level of Certification: Silver
Certification Date: August 2004

Description of Project Services Provided:

Facility Performance Associates and AIR Engineering and Testing (both are Gerald Kettler Companies) were contracted and completed:

  • Energy Efficiency and LEED® Consulting
  • Commissioning of HVAC & R, lighting and building control systems, domestic water
  • Test Adjust and Balance
  • Air Quality Testing Before Occupancy
  • Consultation work with design engineers and architect to provide assistance with the energy simulation model process for LEED®
  • Creation of the schedules of maintenance requirements & frequency
  • Creation of the schedule for re-testing commissioned systems with blank test forms from the original commissioning plan.
  • Creation of the schedule for calibrating sensors & actuators.